Service 04 · Special Requirements & Industrial Systems
Compliance with a deadline. Industrial systems with measured data.
Regulatory IT implementation on a fixed schedule and direct machine data capture – from the controller to the 3D digital twin.
Compliance with a deadline.
Accessibility, e-invoicing, Data Act and Cyber Resilience Act: implemented in the code and at the interface.
IoT & Digital TwinFrom machine data to the digital twin.
Capture at the machine, time-series aggregation, dashboard visualisation and 3D model. Runs as a container on your hardware, connected to MES and ERP.
Block A · Special Requirements
Regulatory deadlines at a glance.
Binding deadlines from legislation and EU regulations. Select a date for details of the technical implementation.
Select a deadline.
Accessibility to WCAG 2.1 AA
- Code audit of website, shop or portal – report with specific code locations and priority
- Barriers fixed in the front end, verified by a follow-up audit
- Legal requirement for many digital services
XRechnung and ZUGFeRD from your software
- Generating, reading and validating directly in the application (EN 16931)
- Connection to ERP, accounting or archive
- Integrated as a decoupled component directly in the core system
Data access for connected products
- Interface for structured, machine-readable and secured data retrieval by users
- “Access by design” for products from 12.09.2026
- Connection to existing device and customer management
Product security under the Cyber Resilience Act
- Vulnerability and update process for software and connected systems with a documented reporting channel
- Security by design, SBOM and technical documentation for CE marking from December 2027
- Aligned with the EU Machinery Regulation 2023/1230 (20.01.2027) for control and edge software
Block B · Industrial Systems
Aggregating machine data and making it visually usable.
Capture and visualisation of machine data streams without a cloud requirement. Runs as a local container with a local time-series database and real-time dashboard.
- OPC UA, MQTT, Modbus – protocol integration, buffering and time-series aggregation
- Real-time dashboards and browser-based 3D twins for buildings and plants
- Structured data transfer to existing ERP and MES systems
- Ready for complex industrial and building infrastructure
Everything else
If your project is not listed …
Talk to us.
Within two working days we will tell you whether we can build it – and if not, who is better placed to.