Service 04 · Special Requirements & Industrial Systems

Compliance with a deadline. Industrial systems with measured data.

Regulatory IT implementation on a fixed schedule and direct machine data capture – from the controller to the 3D digital twin.



Block A · Special Requirements

Regulatory deadlines at a glance.

Binding deadlines from legislation and EU regulations. Select a date for details of the technical implementation.

BFSG · since 28.06.2025

Accessibility to WCAG 2.1 AA

  • Code audit of website, shop or portal – report with specific code locations and priority
  • Barriers fixed in the front end, verified by a follow-up audit
  • Legal requirement for many digital services
E-invoicing · 2025 / 2027 / 2028

XRechnung and ZUGFeRD from your software

  • Generating, reading and validating directly in the application (EN 16931)
  • Connection to ERP, accounting or archive
  • Integrated as a decoupled component directly in the core system
EU Data Act · since 12.09.2025

Data access for connected products

  • Interface for structured, machine-readable and secured data retrieval by users
  • “Access by design” for products from 12.09.2026
  • Connection to existing device and customer management
CRA · 11.09.2026 / 11.12.2027

Product security under the Cyber Resilience Act

  • Vulnerability and update process for software and connected systems with a documented reporting channel
  • Security by design, SBOM and technical documentation for CE marking from December 2027
  • Aligned with the EU Machinery Regulation 2023/1230 (20.01.2027) for control and edge software

machine-07 · hall 2CONNECTED
MachineOPC UA · MQTT
Edge-ContainerBUFFER · PRE-PROCESSING
Time-series DBTIMESCALEDB
Dashboard / twinMES · ERP · 3D
SPINDLE TEMPERATURE42.2 °C
VIBRATION RMS1.35 mm/s
Interval 1 s · Buffer on network loss 72 h · last forwarded to MES — · Alert none

Block B · Industrial Systems

Aggregating machine data and making it visually usable.

Capture and visualisation of machine data streams without a cloud requirement. Runs as a local container with a local time-series database and real-time dashboard.

  • OPC UA, MQTT, Modbus – protocol integration, buffering and time-series aggregation
  • Real-time dashboards and browser-based 3D twins for buildings and plants
  • Structured data transfer to existing ERP and MES systems
  • Ready for complex industrial and building infrastructure

Everything else

If your project is not listed …

Your project is not listed?

Talk to us.

Within two working days we will tell you whether we can build it – and if not, who is better placed to.

A short description is enough

Which system, which goal, which deadline.

Describe your project →